Find the next Liddell — starting with Liddell

Hunter / Muswellbrook

Retired thermal plant, retained transmission, a 500 MW battery, and no verified campus MW.

Flagship post-generation object. AGL has named data centres as a possible partner class.

Location zoom

Sentinel-2 and live meteo

Liddell / Muswellbrook — Hunter Energy Hub

32.372°S 150.978°E

Sentinel-2 cloudless 2024 · pad not a survey

Deliverable MW today

High confidence

0 MW

The 500 MW battery is storage. It is not a verified 500 MW supply to a compute tenant.

Time to power (likely)

Preliminary

2032

Likely later because partner process, studies and fibre are not started as a published DC project.

Overall confidence

moderate

SITE-AU-NSW-LIDDELL-001

Why Hunter / Muswellbrook?

  • Retired ~2 GW.
  • Retained transmission.
  • Land and water assets.
  • Battery operating.

What is missing?

  • Connectable MW.
  • Fibre diversity.
  • A DC application.

Infrastructure class

  • Existing

    Liddell station

    Retired April 2023. Demolition underway.

  • Existing

    Bayswater 2,715 MW

    Closing by 2033.

  • Existing

    Liddell Battery 500 MW / 2 h

    Commercial June 2026. Storage, not campus offtake.

  • Speculative

    Data-centre partnership

    Under consideration.

Candidate sites

Projects

Evidence

  • VerifiedExisting

    Liddell Power Station shut down in April 2023. Neighbouring Bayswater is 2,715 MW coal, scheduled to close by 2033. Combined landholding is 10,000 hectares.

    AGL Energy · AGL in the Hunter Region · published n/a · accessed 2026-09-18

  • VerifiedExisting

    The Liddell Battery is 500 MW / 2-hour and became commercially available in June 2026. This is storage, not a verified offtake for a data-centre tenant.

    AGL Energy · Liddell Battery · published 2026-09-18 · accessed 2026-09-18

  • Moderate confidenceSpeculative

    AGL has stated that data centres are among potential partners under consideration at the Hunter Energy Hub. No data-centre project is approved or power-contracted on the evidence assembled here.

    pv magazine Australia · AGL begins commissioning first 250 MW of Liddell battery · published 2026-03-20 · accessed 2026-09-18