Infrastructure exists. Capacity may not be connectable.

An adjacent transmission line is not spare megawatts. A retired 2 GW station is not a connection offer. A REZ is not a 2028 campus feeder. Adapters are named so the next phase has somewhere honest to land.

  • Proposed

    AEMO

    Generation register, connections, ISP. No live ingest in v0.1.

  • Committed

    Powerlink

    CopperString Eastern Link and Flinders Substation are manually evidenced.

  • Proposed

    Transgrid

    Hunter/Liddell NSP. No published spare-MVA extract.

  • Proposed

    AusNet

    Victorian transmission. Altona parcel NSP not verified.

  • Proposed

    ElectraNet

    South Australia adapter reserved.

  • Proposed

    Western Power

    SWIS. Perth backhaul geography.

  • Proposed

    Horizon Power

    NWIS / Pilbara. Isolated system.

  • Proposed

    NT networks (PWC)

    Darwin–Katherine is not the NEM. Weddell assumes own generation.