Intelligence
Entity → evidence → confidence → decision
DataSentinel is a OneNetwork application. Agents create candidate objects. Humans validate. v0.1 agents are defined and not live.
Primitive chain
- Entity / systemSite, precinct, grid asset, fibre route, project, developer, jurisdiction.
- ObservationA dated metric with an explicit unit — MW, kV, ha, ms, °C.
- Evidence / sourceThe document or dataset behind the observation.
- ProvenanceHow the fact arrived, when it was accessed, what was excluded.
- Model / methodDeliverable MW, time-to-power, thermal suitability, Mousterian fit.
- Intelligence objectA versioned site or project interpretation that can be inspected.
- ValidationWhether an independent human check has occurred.
- ConfidenceVerified / high / moderate / preliminary / unverified / conflicting.
- PermissionsWhat may be shown publicly.
- DecisionA recorded choice that followed the intelligence.
- OutcomeWhat happened after the intervention.
- LearningWhat the network should remember next time — including why projects fail.
Agents
defined-not-live
Project Monitor Agent
Would flag Beetaloo Digital as announced, not approved, on every ingest.
defined-not-live
Grid Agent
Adapters are named. No live queue ingest in v0.1. CopperString is a manually cited committed project.
defined-not-live
Planning Agent
Would separate Botany demolition DA (approved) from a compute DA (not lodged).
defined-not-live
Fibre Agent
DJSC 2023 and Horizon 2026 are manually cited. Latency figures remain estimates.
defined-not-live
Opportunity Agent
Qenos closure and Liddell retirement are the seed's 'find the next Liddell' triggers.
defined-not-live
Failure Agent
v0.1 seeds failure patterns, not a global cancellations census.
defined-not-live
Evidence Agent
Would refuse to promote developer MW to Verified without a network-operator primary source.
defined-not-live
Northern Australia Agent
Would keep CopperString Eastern vs Western distinct on every run.
Watchlists
Mousterian Australia
Eight initial candidates. Ranking is technical compatibility against an editable profile, not a single score.
Northern Australia
First-class development geography.
Retired power stations
Seed contains Liddell as the flagship. Opportunity Agent would expand this set.
Waterfront compute
Mousterian floating/water-adjacent screen.
1 GW+ projects
Announced scale. Not deliverable scale.
Projects without verified power
The core DataSentinel list.
Australian AI infrastructure
Training-class questions. NQ SPARK is sovereign HPC, not GW training.
Sovereign compute
Townsville proposition B is the evidenced seed, not a classified facility.
Alerts
2025-12-23
Lansdown geography — material transmission update
Flinders Substation MID approved 23 December 2025. This is a committed CopperString node near Hughenden, not a Townsville campus reservation. Prospective regional capacity increases in the 2030s remain unallocated to compute.
2026-07-22
Weddell — announced GW, confidence preliminary
NT exclusivity over 185 ha and GW-scale statements. Deliverable MW today remains the Darwin edge market (D1), not Weddell.
2026-06-01
Pilbara — fibre diversity improved
Vocus Horizon lit. This changes the fibre story. It does not create spare NWIS megawatts.
2026-06-01
Liddell Battery commercially available
500 MW / 2 h storage is operating. Do not file as 500 MW of IT load or as a campus offtake.