DataSentinel is a OneNetwork application. Agents create candidate objects. Humans validate. v0.1 agents are defined and not live.

Primitive chain

  1. Entity / systemSite, precinct, grid asset, fibre route, project, developer, jurisdiction.
  2. ObservationA dated metric with an explicit unit — MW, kV, ha, ms, °C.
  3. Evidence / sourceThe document or dataset behind the observation.
  4. ProvenanceHow the fact arrived, when it was accessed, what was excluded.
  5. Model / methodDeliverable MW, time-to-power, thermal suitability, Mousterian fit.
  6. Intelligence objectA versioned site or project interpretation that can be inspected.
  7. ValidationWhether an independent human check has occurred.
  8. ConfidenceVerified / high / moderate / preliminary / unverified / conflicting.
  9. PermissionsWhat may be shown publicly.
  10. DecisionA recorded choice that followed the intelligence.
  11. OutcomeWhat happened after the intervention.
  12. LearningWhat the network should remember next time — including why projects fail.

Agents

  • defined-not-live

    Project Monitor Agent

    Would flag Beetaloo Digital as announced, not approved, on every ingest.

  • defined-not-live

    Grid Agent

    Adapters are named. No live queue ingest in v0.1. CopperString is a manually cited committed project.

  • defined-not-live

    Planning Agent

    Would separate Botany demolition DA (approved) from a compute DA (not lodged).

  • defined-not-live

    Fibre Agent

    DJSC 2023 and Horizon 2026 are manually cited. Latency figures remain estimates.

  • defined-not-live

    Opportunity Agent

    Qenos closure and Liddell retirement are the seed's 'find the next Liddell' triggers.

  • defined-not-live

    Failure Agent

    v0.1 seeds failure patterns, not a global cancellations census.

  • defined-not-live

    Evidence Agent

    Would refuse to promote developer MW to Verified without a network-operator primary source.

  • defined-not-live

    Northern Australia Agent

    Would keep CopperString Eastern vs Western distinct on every run.

Watchlists

  • Mousterian Australia

    Eight initial candidates. Ranking is technical compatibility against an editable profile, not a single score.

  • Northern Australia

    First-class development geography.

  • Retired power stations

    Seed contains Liddell as the flagship. Opportunity Agent would expand this set.

  • Waterfront compute

    Mousterian floating/water-adjacent screen.

  • 1 GW+ projects

    Announced scale. Not deliverable scale.

  • Projects without verified power

    The core DataSentinel list.

  • Australian AI infrastructure

    Training-class questions. NQ SPARK is sovereign HPC, not GW training.

  • Sovereign compute

    Townsville proposition B is the evidenced seed, not a classified facility.

Alerts

  • 2025-12-23

    Lansdown geography — material transmission update

    Flinders Substation MID approved 23 December 2025. This is a committed CopperString node near Hughenden, not a Townsville campus reservation. Prospective regional capacity increases in the 2030s remain unallocated to compute.

  • 2026-07-22

    Weddell — announced GW, confidence preliminary

    NT exclusivity over 185 ha and GW-scale statements. Deliverable MW today remains the Darwin edge market (D1), not Weddell.

  • 2026-06-01

    Pilbara — fibre diversity improved

    Vocus Horizon lit. This changes the fibre story. It does not create spare NWIS megawatts.

  • 2026-06-01

    Liddell Battery commercially available

    500 MW / 2 h storage is operating. Do not file as 500 MW of IT load or as a campus offtake.