Australia firstSentinel-2 mosaic liveOpen-Meteo liveGrid adapter offAnnounced ≠ deliverable

Global Atlas

The geography of compute is physical

Constrained metros displace demand. Australian pads are where this product goes deep. Sentinel-2 is a layer, not a census. Tick a square.

Cartographic night

Constrained and emerging markets

operating constrained

Northern Virginia

The world's densest data-centre market. Transmission, substation and queue constraints are the public story. DataSentinel does not publish a fake MW census in v0.1.

emerging

Texas

ERCOT isolation, interconnection pace, water and community process vary by county. Mousterian has named a Houston-area floating/hybrid concept (Project Zeus) as a plan — not an energised campus.

operating constrained

Phoenix

Heat, water and transmission into a desert metro. Cooling architecture is the product question.

operating

Oregon

Hydro-adjacent hyperscale geography. Transmission and community process still bind.

operating constrained

Dublin

Grid and planning constraints on new large loads have been a defining European case. Do not treat Dublin as an open market.

operating constrained

London

Power availability in West London and related catchments has been a public constraint story. Planning and diesel/backup politics sit on top.

operating constrained

Frankfurt

Power, land and planning in a dense financial-IX geography.

operating constrained

Amsterdam

Moratoria and sustainability tests on new data centres have been part of the public record. Water and land politics matter.

operating constrained

Singapore

Land, power and a managed capacity-allocation regime after earlier moratoria. The point of Darwin and Johor in this atlas.

emerging

Johor

Displaced Singapore demand. Power, water and cross-border fibre are the real gates, not the headline.

emerging

Batam

Another Singapore-adjacent industrial island story. Power and cable, not slogans.

operating

Tokyo

Land, seismic design, power in a dense metro. Not an open desert pad.

operating

Osaka

Secondary Japanese cloud geography. Power and land still bind.

operating

Seoul

Metro land and power. Thin seed.

operating

Taiwan

Seismic, energy mix, and geopolitics as a siting fact. Thin seed.

operating constrained

Hong Kong

Land and power in a dense SAR. Thin seed.

operating

Mumbai

Power quality, land, and monsoon as design facts. Thin seed.

emerging

Hyderabad

Capacity growth market. Power and water still bind. Thin seed.

operating

Dubai

Heat and water. Gas and interconnection are the energy story. Thin seed.

emerging

Abu Dhabi

Sovereign compute and energy-adjacent campus narratives. Verify MW independently.

frontier

Saudi Arabia

Sovereign and energy-seeking campus announcements at very large MW. Treat as announced until energised.

operating

Nordics

Cool climate and hydro/nuclear are the attraction. Transmission, community and residual power availability still bind by country.

Australian pads

metropolitan industrial brownfield

REQUIRES VERIFICATION

Altona petrochemical precinct

Metropolitan industrial brownfield with historic electrical load.

5-year scenario
50–150 MW
Likely power
Not dated
Confidence
Moderate confidence

A compute developer and a grid offer.

metropolitan industrial brownfield

REQUIRES VERIFICATION

Botany Industrial Park — former Qenos

Sydney demand.

5-year scenario
50–200 MW
Likely power
Not dated
Confidence
Moderate confidence

RAP completion.

post industrial post generation

REQUIRES VERIFICATION

Newcastle / Hunter River industrial waterfront

Industrial waterfront.

5-year scenario
100–400 MW
Likely power
Not dated
Confidence
Preliminary

A single controlled site.

post industrial post generation

REQUIRES VERIFICATION

Liddell / Muswellbrook — Hunter Energy Hub

Retired ~2 GW thermal plant.

5-year scenario
100–500 MW
Likely power
2032
Confidence
Moderate confidence

A published connectable MW figure.

northern energy frontier

REQUIRES VERIFICATION

Townsville / Lansdown Eco-Industrial Precinct

2,200 ha High Impact Industrial land under a single public owner.

5-year scenario
50–250 MW
Likely power
2035
Confidence
Moderate confidence

A published connectable MW figure for 2028, 2030, 2032 and 2035.

northern energy frontier

REQUIRES VERIFICATION

Darwin / Weddell industrial area

Live Singapore cable.

5-year scenario
0–500 MW
Likely power
2035
Confidence
Preliminary

FID.

northern energy frontier

REQUIRES VERIFICATION

Port Hedland / Boodarie Strategic Industrial Area

Industrial energy system.

5-year scenario
50–250 MW
Likely power
Not dated
Confidence
Moderate confidence

Spare MW.

northern energy frontier

REQUIRES VERIFICATION

Karratha / Maitland Strategic Industrial Area

Gas and LNG industrial system.

5-year scenario
50–200 MW
Likely power
Not dated
Confidence
Preliminary

Almost every verified MW, fibre and water figure.

northern energy frontier

REQUIRES VERIFICATION

Mount Isa / North West Minerals Province

Minerals province.

5-year scenario
0–50 MW
Likely power
Not dated
Confidence
Preliminary

A Western Link that is actually a line.

northern energy frontier

REQUIRES VERIFICATION

Cairns — Pacific-facing edge

Pacific face.

5-year scenario
10–40 MW
Likely power
Not dated
Confidence
Preliminary

A named edge project with MW.