Global Atlas
The geography of compute is physical
Constrained metros displace demand. Australian pads are where this product goes deep. Sentinel-2 is a layer, not a census. Tick a square.
Cartographic night
Constrained and emerging markets
operating constrained
Northern Virginia
The world's densest data-centre market. Transmission, substation and queue constraints are the public story. DataSentinel does not publish a fake MW census in v0.1.
emerging
Texas
ERCOT isolation, interconnection pace, water and community process vary by county. Mousterian has named a Houston-area floating/hybrid concept (Project Zeus) as a plan — not an energised campus.
operating constrained
Phoenix
Heat, water and transmission into a desert metro. Cooling architecture is the product question.
operating
Oregon
Hydro-adjacent hyperscale geography. Transmission and community process still bind.
operating constrained
Dublin
Grid and planning constraints on new large loads have been a defining European case. Do not treat Dublin as an open market.
operating constrained
London
Power availability in West London and related catchments has been a public constraint story. Planning and diesel/backup politics sit on top.
operating constrained
Frankfurt
Power, land and planning in a dense financial-IX geography.
operating constrained
Amsterdam
Moratoria and sustainability tests on new data centres have been part of the public record. Water and land politics matter.
operating constrained
Singapore
Land, power and a managed capacity-allocation regime after earlier moratoria. The point of Darwin and Johor in this atlas.
emerging
Johor
Displaced Singapore demand. Power, water and cross-border fibre are the real gates, not the headline.
emerging
Batam
Another Singapore-adjacent industrial island story. Power and cable, not slogans.
operating
Tokyo
Land, seismic design, power in a dense metro. Not an open desert pad.
operating
Osaka
Secondary Japanese cloud geography. Power and land still bind.
operating
Seoul
Metro land and power. Thin seed.
operating
Taiwan
Seismic, energy mix, and geopolitics as a siting fact. Thin seed.
operating constrained
Hong Kong
Land and power in a dense SAR. Thin seed.
operating
Mumbai
Power quality, land, and monsoon as design facts. Thin seed.
emerging
Hyderabad
Capacity growth market. Power and water still bind. Thin seed.
operating
Dubai
Heat and water. Gas and interconnection are the energy story. Thin seed.
emerging
Abu Dhabi
Sovereign compute and energy-adjacent campus narratives. Verify MW independently.
frontier
Saudi Arabia
Sovereign and energy-seeking campus announcements at very large MW. Treat as announced until energised.
operating
Nordics
Cool climate and hydro/nuclear are the attraction. Transmission, community and residual power availability still bind by country.
Australian pads
metropolitan industrial brownfield
REQUIRES VERIFICATIONAltona petrochemical precinct
Metropolitan industrial brownfield with historic electrical load.
- 5-year scenario
- 50–150 MW
- Likely power
- Not dated
- Confidence
- Moderate confidence
A compute developer and a grid offer.
metropolitan industrial brownfield
REQUIRES VERIFICATIONBotany Industrial Park — former Qenos
Sydney demand.
- 5-year scenario
- 50–200 MW
- Likely power
- Not dated
- Confidence
- Moderate confidence
RAP completion.
post industrial post generation
REQUIRES VERIFICATIONNewcastle / Hunter River industrial waterfront
Industrial waterfront.
- 5-year scenario
- 100–400 MW
- Likely power
- Not dated
- Confidence
- Preliminary
A single controlled site.
post industrial post generation
REQUIRES VERIFICATIONLiddell / Muswellbrook — Hunter Energy Hub
Retired ~2 GW thermal plant.
- 5-year scenario
- 100–500 MW
- Likely power
- 2032
- Confidence
- Moderate confidence
A published connectable MW figure.
northern energy frontier
REQUIRES VERIFICATIONTownsville / Lansdown Eco-Industrial Precinct
2,200 ha High Impact Industrial land under a single public owner.
- 5-year scenario
- 50–250 MW
- Likely power
- 2035
- Confidence
- Moderate confidence
A published connectable MW figure for 2028, 2030, 2032 and 2035.
northern energy frontier
REQUIRES VERIFICATIONDarwin / Weddell industrial area
Live Singapore cable.
- 5-year scenario
- 0–500 MW
- Likely power
- 2035
- Confidence
- Preliminary
FID.
northern energy frontier
REQUIRES VERIFICATIONPort Hedland / Boodarie Strategic Industrial Area
Industrial energy system.
- 5-year scenario
- 50–250 MW
- Likely power
- Not dated
- Confidence
- Moderate confidence
Spare MW.
northern energy frontier
REQUIRES VERIFICATIONKarratha / Maitland Strategic Industrial Area
Gas and LNG industrial system.
- 5-year scenario
- 50–200 MW
- Likely power
- Not dated
- Confidence
- Preliminary
Almost every verified MW, fibre and water figure.
northern energy frontier
REQUIRES VERIFICATIONMount Isa / North West Minerals Province
Minerals province.
- 5-year scenario
- 0–50 MW
- Likely power
- Not dated
- Confidence
- Preliminary
A Western Link that is actually a line.
northern energy frontier
REQUIRES VERIFICATIONCairns — Pacific-facing edge
Pacific face.
- 5-year scenario
- 10–40 MW
- Likely power
- Not dated
- Confidence
- Preliminary
A named edge project with MW.