Australian Compute Atlas

Australia is the first deep market

Metropolitan brownfields. Post-generation sites. The northern energy frontier. Northern Australia is first-class, not a secondary layer.

Cartographic night

Locations

Pads

metropolitan industrial brownfield

REQUIRES VERIFICATION

Altona petrochemical precinct

Metropolitan industrial brownfield with historic electrical load.

5-year scenario
50–150 MW
Likely power
Not dated
Confidence
Moderate confidence

A compute developer and a grid offer.

metropolitan industrial brownfield

REQUIRES VERIFICATION

Botany Industrial Park — former Qenos

Sydney demand.

5-year scenario
50–200 MW
Likely power
Not dated
Confidence
Moderate confidence

RAP completion.

post industrial post generation

REQUIRES VERIFICATION

Newcastle / Hunter River industrial waterfront

Industrial waterfront.

5-year scenario
100–400 MW
Likely power
Not dated
Confidence
Preliminary

A single controlled site.

post industrial post generation

REQUIRES VERIFICATION

Liddell / Muswellbrook — Hunter Energy Hub

Retired ~2 GW thermal plant.

5-year scenario
100–500 MW
Likely power
2032
Confidence
Moderate confidence

A published connectable MW figure.

northern energy frontier

REQUIRES VERIFICATION

Townsville / Lansdown Eco-Industrial Precinct

2,200 ha High Impact Industrial land under a single public owner.

5-year scenario
50–250 MW
Likely power
2035
Confidence
Moderate confidence

A published connectable MW figure for 2028, 2030, 2032 and 2035.

northern energy frontier

REQUIRES VERIFICATION

Darwin / Weddell industrial area

Live Singapore cable.

5-year scenario
0–500 MW
Likely power
2035
Confidence
Preliminary

FID.

northern energy frontier

REQUIRES VERIFICATION

Port Hedland / Boodarie Strategic Industrial Area

Industrial energy system.

5-year scenario
50–250 MW
Likely power
Not dated
Confidence
Moderate confidence

Spare MW.

northern energy frontier

REQUIRES VERIFICATION

Karratha / Maitland Strategic Industrial Area

Gas and LNG industrial system.

5-year scenario
50–200 MW
Likely power
Not dated
Confidence
Preliminary

Almost every verified MW, fibre and water figure.

northern energy frontier

REQUIRES VERIFICATION

Mount Isa / North West Minerals Province

Minerals province.

5-year scenario
0–50 MW
Likely power
Not dated
Confidence
Preliminary

A Western Link that is actually a line.

northern energy frontier

REQUIRES VERIFICATION

Cairns — Pacific-facing edge

Pacific face.

5-year scenario
10–40 MW
Likely power
Not dated
Confidence
Preliminary

A named edge project with MW.