Australia firstSentinel-2 mosaic liveOpen-Meteo liveGrid adapter offAnnounced ≠ deliverable

Major

CDC Data Centres

Sovereign / government-weighted colocation. Also a host platform for others (Firmus Southgate alliance).

REQUIRES VERIFICATIONModerate confidence

Canberra, Sydney, Melbourne, Perth. SMAP cable-landing adjacency stated in industry coverage.

HQ Canberra

Built MW
Not extracted
Contracted
Announced / pipeline

No independent built-MW total extracted. The 1.6 GW Southgate figure is a Firmus+CDC initiative statement, not CDC built capacity.

Campuses

CampusLocationAnnounced MWBuilt MWStage
Canberra campusesACToperational
Sovereign gravity. MW not extracted.
Sydney / Melbourne / PerthMetrooperational
Presence. MW not extracted.

Why watch

  • The sovereign desk: defence, government, certified enclaves.
  • Firmus alliance for AI factories on CDC platforms — announced 2025.

What is missing

  • Campus MW series.
  • What Southgate actually occupies vs new-build.

Evidence

  • PreliminarySpeculative

    Firmus and CDC described Project Southgate as an initiative that could extend capacity to 1.6 GW through 2028 across Tasmania and mainland metros. Initiative statement, not a connection offer.

    Data Center Dynamics · AI cloud firm partners with CDC for Australian data center capacity · published 2025-10-16 · accessed 2026-09-18