Australia firstSentinel-2 mosaic liveOpen-Meteo liveGrid adapter offAnnounced ≠ deliverable

planning lodged

Supernode North BESS (Solquartz)

Three 260 MW / 8 h batteries. Storage for industrial/silicon, not a compute campus. Announced MW is BESS power, not IT load.

REQUIRES VERIFICATIONModerate confidence
Announced MW
780
Power secured MW
Developer / operator
Solquartz / Quinbrook /
Energisation
Not datedDA lodged; construction not evidenced as commenced.

Open related site object

Evidence

  • Moderate confidenceProposed

    Solquartz lodged a development application for three 260 MW / 8-hour BESS units (Supernode North), described as a catalyst for a proposed Powerlink 275 kV substation at Lansdown.

    Industry Queensland · Solquartz forges ahead as Lansdown takes shape · published 2025-09-22 · accessed 2026-09-18