SITE-AU-WA-PORT-HEDLAND-BOODARIE-001

Port Hedland / Boodarie Strategic Industrial Area

20.428°S 118.551°EREQUIRES VERIFICATIONModerate confidence
Announced
None
5-year scenario
50–250 MW
Likely energisation
Not dated

Port Hedland / Boodarie Strategic Industrial Area

20.428°S 118.551°E

Sentinel-2 cloudless 2024 · pad not a survey

Industrial energy system.

Read this pad as

Three desks

Developer

Can I get a pad, a connection, and cooling without waiting a decade?

  • A 210 MW station on the map is not 210 MW for sale to a training cluster.
  • Time to power — likely not dated. NWIS cannot be treated like a NEM connection queue. You bring generation or you do not build.
  • Desert/cyclone. PH1 used 55 °C-rated condensers. High-density liquid is the only serious architecture above a few MW.

Financier

What MW is actually deliverable, and what would break the case?

  • Announced none MW · 5-year scenario 50–250 MW (preliminary).
  • Spare MW.
  • No verified financing for a compute campus on this site.

Mayor / state

What is real on this land, and what would fail in public?

  • SIA exists. Hyperscale compute not applied for.
  • Industrial energy system.
  • Iron processing and hydrogen are the evidenced land uses.

Deliverable MW

Announced is not deliverable

Ranges are scenarios with an infrastructure class and a confidence band. They are not a grid offer.

  1. Today

    1–2 MW

    NEXTDC PH1 planned IT capacity 1.5 MW. That is the evidenced compute.

    High confidence

  2. +3y

    1–50 MW

    A step-up is conceivable only with dedicated generation. Not evidenced.

    Preliminary

  3. +5y

    50–250 MW

    Industrial-energy colocation scenario. Competing HBI/hydrogen load is the evidenced demand.

    Preliminary

  4. +10y

    100–500 MW

    Only with a dedicated generation and water story. Speculative.

    Preliminary

  • Pilbara is one of the world's largest industrial energy systems. That is not a published surplus for AI training.
  • Existing compute is edge (PH1 1.5 MW) with cyclone and 55 °C condenser design.
  • Vocus Horizon now gives a second long-haul to Perth and a path toward DJSC.

Why here

  • Industrial energy system.
  • Port.
  • Horizon fibre change in 2026.
  • 4,000 ha SIA.

What is missing

  • Spare MW.
  • Water.
  • A compute proponent at scale.
  • Workforce housing at campus scale.

Time to power

Earliest is not likely

Earliest plausible
2031
Likely

NWIS cannot be treated like a NEM connection queue. You bring generation or you do not build.

Energy

Exists ≠ connectable

A 210 MW station on the map is not 210 MW for sale to a training cluster.

North West Interconnected System (isolated) · Horizon Power / Alinta (confirm per connection)

Workload fit

  • Industrial / mining AIFitsThis is the product: mine-gate, port, autonomous systems. PH1 already points there.
  • AI training / HPCConditionalColocation with industrial energy is the hypothesis. Surplus MW is not shown.
  • Edge / regionalFitsPH1 is the existence proof at 1.5 MW.
  • AI inferenceFailsWrong population geography.
  • Cloud / hyperscaleFailsNot an AZ geography unless a hyperscaler decides otherwise with its own power.
  • Sovereign / defenceUnknownNot the primary evidenced demand.

Required for scale

  • 100 MWPreliminary

    Dedicated generation, not a tap on Alinta 210 MW.

  • 250 MWUnverified

    A power station, water, and a fibre design beyond PH1.

Fibre

Horizon 2,000 km Perth–Port Hedland, 38 Tbps stated, with a path to DJSC. This is the 2026 change.

  • Perth: 20 ms
  • Singapore: 40 ms
  • Sydney: 50 ms

Thermal / hazards

Hot desert / cyclone coast.

Heat is an energy penalty. The industrial energy system is the offset — if it is actually available.

Cyclone: Design-level. PH1 used tie-downs and debris protection as an existence proof at 1.5 MW.

Development

landControl
State SIA process. Resource processors already allocated.
planning
Strategic Industry. Compute would be a new use in a processing estate.
environmental
Industrial estate. Lot-level assessment required.
approvalStatus
SIA exists. Hyperscale compute not applied for.
remediation
Not a Qenos RAP story. Confirm per lot.
contamination
Industrial. Confirm.
tenure
SIA allocation.
construction
Resource-processing pipeline, not DC.

Risk

  • demand

    Iron processing and hydrogen are the evidenced land uses.

  • power

    Isolated system. Bring your own generation at scale.

Graph

  • boodarieNEARPort Hedland
  • boodarieCONNECTED_TOAlinta 210 MW
  • boodarieSUPPORTED_BYVocus Horizon

Evidence

  • VerifiedExisting

    Boodarie Strategic Industrial Area comprises 4,000 ha of Strategic Industry zoned land. Alinta Energy's 210 MW gas-fired power station operates within the SIA. POSCO and Fortescue have land allocations for resource processing.

    DevelopmentWA · Boodarie SIA overview · published n/a · accessed 2026-09-18

  • High confidenceExisting

    NEXTDC PH1 Port Hedland has a planned IT capacity of 1.5 MW. It is an edge facility for mining and port operations, not a training campus.

    NEXTDC · PH1 Port Hedland Data Centre facility overview · published n/a · accessed 2026-09-18

  • High confidenceExisting

    Vocus Horizon is a 2,000 km fibre network between Perth and Port Hedland, stated at 38 Tbps, with a path into the Darwin–Jakarta–Singapore Cable.

    w.media / Vocus · Vocus completes 2,000km Horizon fibre network linking Pilbara · published 2026-06 · accessed 2026-09-18